Drywall Calculator

Calculate how many drywall sheets and materials you need.

Getting your drywall order right

Deduct doors and windows from wall area, account for cutting waste, and check local code before choosing board type.

Working out drywall mud and tape

Joint compound — usually just called mud on site — is sold in buckets by weight. As a rule of thumb, allow roughly one 4.5-gallon bucket per 90 square feet of Sheetrock for a standard three-coat finish, plus about one 250 ft roll of paper tape per 135 square feet. This drywall mud calculator works both out automatically from your room dimensions, so you don’t have to estimate separately. If you would rather think in boards than in square feet, the per sheet figures are below.

Tiling a bathroom or kitchen wall instead of finishing it? Use the tile calculator for backsplash and shower surrounds.

How much mud per sheet of drywall

Coverage is normally quoted by the square foot, but almost nobody buys drywall that way. A standard 4 × 8 sheet is 32 square feet, so one 4.5-gallon bucket of joint compound covers roughly 3 sheets at a standard three-coat finish. A 4 × 12 sheet is 48 square feet, which works out closer to 2 sheets per bucket.

Those are starting figures, not guarantees. How much mud you actually get through depends on how many coats you run, how flat your framing is, and how heavy-handed you are with the knife. A level 5 finish uses noticeably more than a level 3.

The calculator works from your room dimensions rather than your sheet count, so it accounts for the offcuts and part-sheets a per-sheet estimate misses.

Related calculators

FAQ

For walls only at 8 ft height, that’s about 2×(12+12)×8 = 384 sq ft. With 10% waste and 4×8 sheets (32 sq ft each), that’s roughly 14 sheets — add the ceiling for a full room.